Construction of a gas treatment and compression plant

Client:

Technip FMC

Project:

ORF

Scope:

  • Gas plant: Prefabrication and installation of piping, structure, equipment
  • and E&I installation.
  • 800 people for 18 months, including the local community.
  • Construction of a base camp and temporary workshop (4,000″/month)

Other projects

EPC on an offshore tripod platform
1,200 metric tons of structures
Manufacture of subsea spools

Do you have
a project ?

Scroll to Top