Combined cycle construction and installation

Client:

BRIDGE POWER

Project:

Metka

Location:

Tema - Ghana

Scope:

  • Open combined cycle x 5 mobile gas turbines (5x25MW)
  • Manufacture of 2 water storage tanks (53200, 650 m3) + 1 dematerialized water tank.
  • Installation of 5 transformers
  • Installation of 29 250 Inch / 1 900 valves.
  • Manufacture of structure (52T support and 108 T frame)