Building an offshore process module

Client:

TOTAL

Project:

DALIA CLOSED FLARE PROJECT

Location:

ANGOLA

Scope:

Engineering / Procurement / Manufacture and integration of a module and interconnection lines to recover the gases from the FPSO so that they are no longer burned off in the atmosphere.

  • 200 metric tons
  • Piping: 6,900
  • Valves: 30 T
  • Estimated hours: 370,000 hrs

Other projects

EPC on an offshore tripod platform
Construction of a gas treatment and compression plant
1,200 metric tons of structures