EPCC project on a hydrocarbon terminal

Client:

Sonabhy

Project:

EPCC for a liquid hydrocarbon storage and distribution terminal

Location:

Bingo, Burkina Faso

Scope:

  • 2 tanks of 30,000 m3
  • 10 unloading docks
  • Product pumping station
  • 20 months
  • EPCC project

Other projects

LPG spheres in EPCC mode
A bitumen depot, from design to installation
Revamping of vertical tanks

Do you have
a project ?

Scroll to Top